Arrow were contracted to carry out a feasibility study and a full Mechanical and Engineering (M & E) design into the conversion from fossil fuel to renewable energy at Gunby Hall in Lincolnshire.
Read MoreAdrian Fox, Lead Project Manager – Renewable Energy, National Trust, appointed Arrow to join the ‘Grow Your Own’ project team; a £30million sustainability scheme aiming to reduce the energy consumption of National Trusts properties.
Read MoreArrow was contracted to provide the mechanical & electrical design services at a new country club development located on a luxury home site in Tewitfield 20 miles from the Lake District National Park.
Read MoreArrow is delighted to have been awarded the contract for the Stage 2 Mechanical & Electrical design at Ellel Gardens
Read MoreWindermere Works Business Centre appointed Arrow to design a mechanical ventilation heat recovery system, plus an air conditioning system, for its new ground floor office development within its office complex in Windermere, Cumbria.
Read MoreArrow have been attentive and quick to respond to both client and technical queries in the design development stages. They clearly have an excellent technical grasp of the nuances of renewable energy relating to Air Source Heat Pumps and associated complimentary low temperature radiator design. The final issue working drawings and specification where clear and easy to read, facilitating a smooth transition from design development sign off to site implementation.
Read MoreTretonia (UK) Limited contracted Arrow to carry out the mechanical and electrical (M&E) design for their prestigious A-rated housing development at Viver Green in Hincaster, Cumbria.
Read MoreThank you Alistair and your team at Arrow for designing, overseeing and with genial authority guiding us through our 300m2 barn conversion.
Read More