Gunby Hall
Arrow were contracted to carry out a feasibility study and a full Mechanical and Engineering (M & E) design into the conversion from fossil fuel to renewable energy at Gunby Hall in Lincolnshire.
The feasibility study evaluated biomass, ground source heat pumps and solar PV.
The mechanical and electrical design contract was for the secondary side throughout the house. This was complex and difficult work, surveying the building and then designing a route and conversion to facilitate the design, so that the property has a robust solution for the primary heating.